# TB rack.

![TB rack](https://de.elvorka.com/assets/optimized/2b8fe35077745c40-1584-q92.webp)

Low-voltage battery

# TB rack.

Four specified LFP battery capacities for rack-mounted storage and a compatible external inverter.

INVERTER  Compatible external inverter required

ENCLOSURE  IP20

NOMINAL ENERGY  5.12–16.076 kWh

BATTERY VOLTAGE  51.2 V nominal DC

[Start your project ↗](https://de.elvorka.com/en/#enquiry)

## Specifications

| Model / configuration | Energy (kWh) | Rated DC (kW) |
| --- | --- | --- |
| TB4000X | 5.12 | 5 |
| TB6000X | 10.24 | 10 |
| TB8000X | 14.336 | 10 |
| TB8500X | 16.076 | 10 |

Wi-Fi / Bluetooth is listed for TB6000X, TB8000X and TB8500X, excluding TB4000X. Power ratings are battery-side DC.

| Model | Dimensions (mm) | Approx. kg |
| --- | --- | --- |
| TB4000X | 482 × 178 × 420 / W × H × D | 42 |
| TB6000X | 482 × 223 × 550 / W × H × D | 78 |
| TB8000X | 482 × 223 × 710 / W × H × D | 109.5 |
| TB8500X | 482 × 223 × 710 / W × H × D | 112 |

Communication: RS485 / CAN / RS232
Temperature: Charge 0 to 55 °C; discharge −20 to 60 °C

## Choose for the equipment room, not a national average.

A cooler garage in an upland location, a dry basement utility room and a summer-warm room in the Rhine region need different checks. Use the temperature and exposure at the battery position to narrow the configuration.

Temperature:  Charge 0 to 55 °C; discharge −20 to 60 °C

ENCLOSURE  IP20

01

### Cooler winter location · garage or outbuilding

Germany has regional temperature differences; an unheated equipment room must be assessed separately from the occupied home.

Compare the exact family's charging limits before choosing the placement. TR Pro lists charge 0 to 55 °C and discharge −20 to 60 °C. Optional self-heating needs configuration confirmation; the lower discharge boundary is not permission for subzero charging.

Can the battery position fall below 0 °C during charging?

- Will the selected heating and charging protections be confirmed for this exact model?

- Does the location remain dry when cold equipment meets warmer air?

02

### Basement utility room · dry and accessible

A dedicated Hauswirtschaftsraum can organise storage and service access; assess actual damp, ventilation and access rather than assuming every basement is suitable.

The EU all-in-one combines inverter and battery in an IP21 housing; it needs no extra inverter. Battery-only TR, HP or TB families require a compatible external inverter. Preserve the selected manual's ventilation and service space.

Is there damp, condensation or a known water-entry route?

- Are ventilation and service access clear of storage items?

- Is this a new integrated installation or an addition to an existing inverter?

03

### Warmer summer region · indoor heat

Official climate indicators identify warmer summer areas including the Upper Rhine and Rhine-Neckar/Rhine-Main regions; the building can further change equipment-room conditions.

Record the warmest expected temperature at the unit. A listed charging upper limit does not establish full-power operation in an enclosed sun-heated room. HP Ultra temperature limits must be confirmed for the selected configuration; do not copy TR Pro's limits onto it.

Does the room accumulate afternoon or roof heat?

- What are the exact model's temperature and output derating requirements?

- Can the proposed mounting position maintain the required cooling space?

Specifications

- Choose architecture first: EU and TA6000 include an inverter; battery-only families require an external compatible inverter and confirmed communication.

- Keep charging and discharging temperatures separate. Optional heating and the TA6000 general operating field do not establish universal subzero charging.

- IP21, IP20, optional IP54 and IP66 are distinct source ratings. None by itself establishes condensation, flooding or coastal salt-spray suitability.

PRODUCT DETAIL / ORIGINAL LITERATURE

## Every side. Every connection.

The native front feature illustration and exploded callout illustration have visible layout differences and are not proven to be the same hardware revision. Keep each original view's source identity. The source has no external rear-view photograph. Internal/thermal diagrams must not be described as exterior rear or underside photos.

[![Original front terminal and control strip](https://de.elvorka.com/assets/product-details/tb-rack-front-terminal-strip.png)](https://de.elvorka.com/assets/product-details/tb-rack-front-terminal-strip.png)

Original front terminal and control strip  Front terminal and control strip, with the negative terminal left and positive terminal right.

[![Negative power terminal, front left](https://de.elvorka.com/assets/product-details/tb-rack-negative-terminal.png)](https://de.elvorka.com/assets/product-details/tb-rack-negative-terminal.png)

Negative power terminal, front left  Negative terminal and minus mark at the front left.

[![Positive power terminal, front right](https://de.elvorka.com/assets/product-details/tb-rack-positive-terminal.png)](https://de.elvorka.com/assets/product-details/tb-rack-positive-terminal.png)

Positive power terminal, front right  Positive terminal and plus mark at the front right.

[![Original communication and control area](https://de.elvorka.com/assets/product-details/tb-rack-communication-controls.png)](https://de.elvorka.com/assets/product-details/tb-rack-communication-controls.png)

Original communication and control area  Communication connectors, indicators and power switch on the front control strip.

[![Original cell and BMS construction detail](https://de.elvorka.com/assets/product-details/tb-rack-internal-cells-bms.png)](https://de.elvorka.com/assets/product-details/tb-rack-internal-cells-bms.png)

Original cell and BMS construction detail  Partial internal illustration showing battery cells and the BMS board.

### Know your interfaces.

#### Power connections

Positive power terminal  Power port on the viewer's right in the illustrated front panel, with the original plus mark.

Negative power terminal  Power port on the viewer's left in the illustrated front panel, with the original minus mark.

#### Communication

Dry Connect (source label)  Source names this a communication port labelled 'Dry Connect'. Contact logic, pinout and electrical ratings are not given.

COM0 / COM1 parallel ports  Ports explicitly captioned 'Parallel Port' in this source. Parallel-system limits and wiring are not supplied.

CAN / RS485  Communication port group named CAN/RS485. Appearance alone does not prove Ethernet networking or a compatible inverter protocol.

RS232  Communication port named RS232; exact pinout and adapter requirements are not provided.

#### Controls & indicators

Power switch  Power on/off switch as described in the original caption. Operating sequence is not supplied.

SOC / ALM / RUN indicators  Indicator-light group identified by the source. Individual colour meanings and diagnostic codes are not specified.

Address identification control  Control labelled 'Add'; the caption states automatic address identification. Setup method and address logic are not specified.

#### Structure & mounting

Laser welding  The brochure describes laser welding for the aluminium-plate and cell connection. It is an internal construction feature, not a port.

Steel holder  Internal steel holder identified as fixing the cells; not an external connector.

Plastic steel belt (source wording)  Cell-retaining band described in the source as preventing movement-related impacts; material performance is not independently validated.

Built-in smart BMS  Built-in BMS. The manufacturer lists temperature protection, short-circuit protection and balancing; this extraction does not independently verify those functions.

Portable handle  Steel handle as described in the source. It is not an electrical port.

Source: Residential ESS brochure · PDF page 7 · printed pages 13-14

---

https://de.elvorka.com/en/products/tb-rack/

ELVORKA · eric@elvorka.com
